![]() In the beginning, it’s mostly about traversing throughout the Fishing Port to find the lights. ![]() There’s so much more to gameplay than just the paintings. Travelling rooftops keeps you hidden from bullies. ![]() A press of the Triangle button will re-center the brush, and you can also switch the settings to use the Right Stick instead of motion, something I only learned after finishing the game. The motion controls can be finicky, which was one of the few issues I had with the game overall. I was initially worried that the learning curve of creating these masterpieces might be steep, like Media Molecule’s Dreams, but rest assured it’s a simple procedure that any one can master. #Concrete genie hydroelectric plant pages Ps4#Related Content – The Best PS4 ExclusivesĬoncrete Genie turns your controller into Ash’s magical paintbrush by using the motion controls to simulate the act of painting. The more pages of your sketchbook that you find scattered along the way will offer you a larger repertoire of subjects and genies to paint. ![]() Each section is split up into zones, and you need to find all the lights and turn them on by painting the areas around them. It is made of 720,000 cubic metres (940,000 cu yd) of material and withholds a 18,400,000 m 3 (650,000,000 cu ft) reservoir.The abandoned town provides a rather sizable canvas for you to paint on. The Ueno Dam, in Gunma Prefecture, is a 120 metres (390 ft) high and 350 metres (1,150 ft) long concrete-gravity dam. The Minamiaiki Dam is located in Nagano Prefecture and is a 136 metres (446 ft) high and 444 metres (1,457 ft) long rock-fill dam. The power station also has an effective hydraulic head of 653 metres (2,142 ft) and maximum discharge of 510 cubic metres per second (18,000 cu ft/s). The water tunnel connecting the two reservoirs is 3.8 miles (6.1 km) long. The pump-generators can then pump water from the lower reservoir back up to the upper reservoir for re-use in hydroelectric power production. Water from the upper Minamiaiki Reservoir is transferred through the power house and after producing electricity, it is brought to the lower Ueno Reservoir. It will contain 6 x 470 MW pump generators for a total capacity of 2,820 MW. The power station is 1,600 feet (490 m) underground and measures 708 ft (216 m) long, 108 feet (33 m) wide, and 169 feet (52 m) high. The remaining units 3-6 are scheduled for commissioning by 2032. #Concrete genie hydroelectric plant pages generator#The first generator was commissioned on 22 December 2005 and the second on 7 June 2012. Both dams were completed and the upper reservoir was filled by 2004. ![]() In May 1997, construction on the project began and by October 2003, the area behind the Ueno Dam was being inundated with water and the next year, the Minamiaiki Dam's reservoir began to fill as well. In July 1993, the Kannagawa Hydropower Field Survey Office was initiated and in July 1995, the power plant was approved by the Electric Power Development Coordination Council. When completed, the plant will have the second-largest (after Bath County Pumped Storage Station) pumped-storage power capacity in the world. Unit 1 commenced commercial operation in 2005 and Unit 2 in 2012. The power station in between the two dams will contain six 470 megawatts (630,000 hp) pump-generators for a total installed capacity of 2,820 megawatts (3,780,000 hp). The power plant utilizes the Minamiaiki River along with an upper and lower reservoir created by two dams, the upper Minamiaiki Dam and the lower Ueno Dam. The Kannagawa Hydropower Plant (神流川発電所) is an under construction pumped-storage hydroelectric power plant near Minamiaiki in Nagano Prefecture and Ueno in Gunma Prefecture, Japan. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |